Ryan Blatz | Structural
Orange Regional Medical Center
Middletown, New York
______________________

 

Technical

Assignments

 

 

 

FULL TECHNICAL REPORT

____________________________________________________

Technical Report I - Existing Conditions

Technical Report II - Alternate Floor Systems

Technical Report III - Lateral System Analysis

 

 

 

_____________________________________________________

Technical Report I

Technical Report I is an analysis of the existing structure in terms of gravity and lateral loads. Enclosed is an adequacy report of the floor system, beams, girders, and columns to carry loading from gravity, in a addition to a derivation of lateral forces from wind and seismic.

_____________________________________________________

Technical Report II

Technical Report II is a continuation of Existing Conditons that analyzes three alternative floor systems in addition to the existing system. This report involves preliminary design to determine the viability of that system structurally, for the existing load conditions, and non-structurally, in relation to the other project disciplines.

_____________________________________________________

Technical Report III

Technical Report III continues off of the Alternate Floor Systems report to address lateral loading. This report analyzes the existing structure using both an ETABS model and hand checks to determine how the stucture reponds to resist wind and seismic loads. The findings are then compared with the expected values from intuition and ASCE7-10.

_____________________________________________________

Click Here or the picture to the left to view the full report in pdf format. (Revised 4/26/12)

 

Senior Thesis Main Page Penn State Homepage AE Homepage AE Computer Labs Contact Ryan Blatz

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐inprogress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Ryan Blatz. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design."

This page was last updated on 11/18/11, by Ryan Blatz and is hosted by the AE Department ©2011